Concrete Technology
Tower Crane
Crushing Plant
Earth Moving Machine
Motor graders stand out for their functionality. They are used in various areas such as creating slopes, trenching, snow plowing and scraping.
220 Hp
Max. Power
Pi kazıcı yükleyiciler zorlu koşullarda maksimum performans göstermektedir. Yükleme işleri, kanal kazısı, kırım işleri, her türlü malzemenin hafriyatı...
100Hp
Max. Power
Cone crushers are designed to crush the hardest and most corrosive materials such as granite, basalt and andesite.
50-200 t/h
Capacity
Pi Makina, which has produced the largest Crushing and Screening Facilities in Turkey and the world, produces solutions suitable for every project and need.
50-500 ton/h
Capacity
Pi Tower Cranes is also suitable for use in structures built through tunnel formwork technology with a load lifting capacity of 8-10-12 tons.
60-75 m
Jib Length
Pi Makina is capable of manufacturing stationary, mobile, compact, dry type and precast type concrete batching plants with capacity from 30 m³ to 360 m³ per hour.
30-360 m3/h
Concrete Capacity
Truck-mounted concrete pumps, which can distribute concrete between 130m3 and 140m3, deliver concrete up to height of 56 meters.
31 - 56 m
Pumping Height
The concrete transport system is designed to increase efficiency and reduce costs in the production of prefabricated concrete elements (mold concrete).
1-2 m3
Hopper Capacity
Home Page > NEWS > Pi Makina pumps continue to operate in the largest projects of the world

Pi Makina pumps continue to operate in the largest projects of the world

In a large project accommodating 1260 houses built with Pi Makina concrete pumps in Karbala, Iraq, batching plants and concrete pumps have been operating flawlessly for about 2 years. DURRAT KARBALA CO. appreciates Pi Makina in this project based on its full confidence therein and impeccable service provided by the same.

DURRAT KARBALA CO. is starting its project of 1260 villas in Iraq!
A total of $150 million worth of Durrat Karbala project was commenced in Iraq...
In the 20th year of its foundation, Marmara Engineering & Construction Inc. commenced the Durrat Karbala project in Iraq with a total value of $150 million...

The groundbreaking ceremony of the project is being held with the participation of Iraqi Prime Minister, Maliki, Prime Minister Ali Dabbagh and several guests.
Durrat Karbala project consists of 1260 villas, 3 schools, 2 mosques, sports facilities, shopping center and social facilities over an area of 660.000 m2...

The Karbala project will be completed in 3 years. The completion of the project will change the face of Karbala City and render it becomes a modern living hub... The concrete plant and concrete pump used in the project continue to give confidence under Pi Makina brand.

Tower Crane

Tower Crane

Earth Moving Machine

Backhoe Loader

Motor Grader

        
©1972-2022 Pi Makina